  "generated_at": "2026-08-07T00:00:00Z",
  "summary": {
    "as_of_date": "2026-06-18",
    "source_refresh_date": "2026-07-15",
    "display_date": "Queue metrics Jun 18, 2026; sources refreshed Jul 15, 2026",
    "source_document_ids": [
      "ercot-llwg-index"
    ],
    "buckets": [
      {
        "status": "submitted",
        "mw": 466497,
        "project_count": null,
        "notes": "ERCOT June 19 2026 LLWG 'Large Load Interconnection Status Update' slide 3 'Large Load Queue - Past 12 Months': 396,789 MW standalone + 69,708 MW co-located = 466,497 MW total queue for snapshot June 18, 2026."
      },
      {
        "status": "approved_to_energize",
        "mw": 8927,
        "project_count": null,
        "notes": "ERCOT June 19 2026 LLWG Report slide 8 verbatim: 'Of the 8927 MW that have received Approval to Energize' (slide 6/12 chart shows 8,926 MW for the same snapshot; both preserved per review)."
      },
      {
        "status": "observed_energized",
        "mw": 3900,
        "project_count": null,
        "notes": "ERCOT June 19 2026 LLWG Report slide 8 verbatim non-simultaneous monthly peak consumption of 3,900 MW in June 2026; simultaneous peak 3,675 MW (slide 9)."
      },
      {
        "status": "approved_to_energize_not_operational",
        "mw": 5027,
        "project_count": null,
        "notes": "Derived: 8,927 MW approved to energize minus 3,900 MW observed operating (slide 8), June 2026 snapshot."
      },
      {
        "status": "planning_studies_approved",
        "mw": null,
        "project_count": null,
        "notes": "Not published: stage scope varies by LLWG cycle and is captured internally, not in the public funnel summary."
      },
      {
        "status": "under_ercot_review",
        "mw": null,
        "project_count": null,
        "notes": "Not published: review-stage classification is captured internally, not in the public funnel summary."
      },
      {
        "status": "no_studies_submitted",
        "mw": null,
        "project_count": null,
        "notes": "Not published: no-studies parked load is captured internally, not in the public funnel summary."
      }
    ],
    "by_sector": [
      {
        "sector": "data_center",
        "mw": 420812,
        "project_count": null,
        "notes": "ERCOT June 19 2026 LLWG Report slide 14 'Large Load Project Distribution by Type': 90.2% Data Center (420,812 MW directly labeled)."
      },
      {
        "sector": "crypto",
        "mw": 14928,
        "project_count": null,
        "notes": "Crypto 3.0% + Data Center/Crypto 0.2% = 3.2% of the 466,497 MW queue (slide 14)."
      },
      {
        "sector": "industrial",
        "mw": 4665,
        "project_count": null,
        "notes": "Industrial 1.0% of the 466,497 MW queue (slide 14). Classification basis changes from editorial approximation to ERCOT's own classification at this snapshot."
      },
      {
        "sector": "other",
        "mw": 26092,
        "project_count": null,
        "notes": "Not Specified 4.8% + Hydrogen 0.8% = 5.6%; residual computed to balance total (466,497 - 420,812 - 14,928 - 4,665)."
      }
    ],
    "by_tsp": [],
    "by_load_zone": [],
    "notes": [
      "Public source materials expose aggregate status and process information, but do not provide a complete named customer queue.",
      "Values sourced from ERCOT's June 19 2026 LLWG Report (Large Load Interconnection Status Update), data as of June 18, 2026, reviewed from the official PPTX on July 15, 2026.",
      "This snapshot captures queue state adjacent to the PUCT's June 18, 2026 approval of the Batch Zero interconnection framework (PGRR145/NPRR1325, effective July 11, 2026), which ended the prior Planning Guide Section 9 process on July 10, 2026.",
      "Month-over-month, the total queue fell 4,918 MW from May (471,415 MW) to June (466,497 MW) due to cancelled or duplicate ticket removal and stage consolidation (report slide 2), not declining demand.",
      "Operator review: the June 2026 LLWG payload stored in data/processed/load/large_load_refresh_candidate.json was approved for the public summary on 2026-08-07 (Matt Prusak, via agent). This tracker was reconciled to the same snapshot the chartbook funnel already published.",
      "Named or customer-specific load-study rows should be treated as private candidates until a public filing source is captured and reviewed."
    ]
  }
}